CATArithmetic > MediumEntered answer:✅ Correct Answer: 6Related questions:CAT 2023 Slot 3Gautam and Suhani, working together, can finish a job in 202020 days. If Gautam does only 60%60 \%60% of his usual work on a day, Suhani must do 150%150 \%150% of her usual work on that day to exactly make up for it. Then, the number of days required by the faster worker to complete the job working alone isCAT 2018 Slot 1When they work alone, BBB needs 25%25 \%25% more time to finish a job than AAA does. They two finish the job in 131313 days in the following manner: AAA works alone till half the job is done, then AAA and BBB work together for four days, and finally BBB works alone to complete the remaining 5%5\%5% of the job. In how many days can BBB alone finish the entire job?CAT 2018 Slot 2A water tank has inlets of two types AAA and BBB. All inlets of type AAA when open, bring in water at the same rate. All inlets of type BBB, when open, bring in water at the same rate. The empty tank is completely filled in 303030 minutes if 101010 inlets of type AAA and 454545 inlets of type BBB are open, and in 111 hour if 888 inlets of type AAA and 181818 inlets of type BBB are open. In how many minutes will the empty tank get completely filled if 777 inlets of type AAA and 272727 inlets of type BBB are open?